Applications / Project requirements

Industrial

Start with the operating environment.

Understand the conditions.

A useful industrial flooring discussion begins with the actual exposures, substrate and failure history.

Questions to bring to the conversation

  • What equipment crosses the floor?
  • What has failed, and where?

What to evaluate

  • Mechanical loads and traffic
  • Chemical exposure list
  • Moisture evaluation

CST connects the material discussion with preparation, installer training and technical support. Share project requirements so suitability can be assessed before a system is selected.

Start the system discussion

Finish directions to explore.

These links are starting points for discussion. They do not establish suitability, regulatory compliance or performance for a particular project.

The next step

Discuss your application requirements.

Describe the concrete, its condition and the finish you want.

Discuss your project